Skip to main content

End effectors & tool setup

Treat mechanical mounting, power, communication, and software integration as separate checks. A flange adapter alone does not establish complete teleoperation or data-recording support.

Integration checklist​

AreaConfirm for the exact tool
MechanicalFlange drawing, adapter, fasteners, tool envelope, and cable clearance
ElectricalVoltage, current, connector pinout, and external supply requirements
CommunicationDevice protocol, bus configuration, and matching driver
DynamicsTool mass, center of mass, and inertia configuration
ControlCommand mapping, limits, and handover behavior
RecordingAvailable signals, timestamps, and synchronization

Source resources​

The mechanical integration folder contains tool dynamics identification instructions and a six-axis force/torque sensor installation guide. The model folder also contains a Wuji Hand 2 / D405GA flange package.

Open mechanical integration resources.

Tool dynamics​

The Pro manual describes collecting no-load and loaded trajectories, calculating tool mass, center of mass, and inertia, then applying the tool parameters. These procedures cause motion and require the correct arm configuration and identification trajectory. They are not part of the beginner setup sequence.

Wrist supply voltage depends on the arm configuration, so don't take it from a generic product table. Confirm your arm's electrical interface before attaching a hand or camera.